Improvement Group 2: fully funded with SMART SCALE funds from VDOT

Construction estimated to begin in 2022

Bailey Bridge Connector

  • Construct the Bailey Bridge Connector as a two-lane roadway between Brad McNeer Parkway and Bailey Bridge Road
  • Construct a roundabout at the intersection of the Bailey Bridge Connector and Brad McNeer Parkway
  • Construct a shared-use path along the Bailey Bridge Connector to accommodate bicycle and pedestrian traffic
Map

Why It’s Needed

Route 360 west of Route 288 is a congested corridor plagued by heavy delays and crashes during the rush hours. Route 360 carries over 78,000 vehicles a day, significantly more than on Route 288 between Powhite Parkway and Route 360 (60,000 vehicles per day). As growth continues to the west, traffic on Route 360 is projected to exceed 120,000 vehicles per day by the year 2040. This is comparable to the amount of traffic currently on Interstate 95 near Route 10 in Chester.

Data collected with the Route 360/Route 288 Interchange Area Study shows that 30% of the traffic utilizing the Route 360/Route 288 Interchange could be diverted to a new collector road between Brad McNeer Parkway and Bailey Bridge Road.

Image

Benefits

The Bailey Bridge Connector will:
  • Provide direct access to businesses and services along Route 360 from areas along Bailey Bridge Road
  • Reduce traffic volumes on Route 360
  • Provide a safe travel alternative for pedestrians and cyclists
  • Provide a foundation for future improvements in this area

Stay Informed

Sign up for our newsletter
Traffic Alerts