288 SB to 360 WB

Status: PRELIMINARY ENGINEERING UNDERWAY

Route 288 Southbound to Route 360 Westbound Off-Ramp Improvements

  • Lengthen the Route 288 southbound to Route 360 westbound off-ramp, widening it to two lanes
  • Construct a park-and-ride lot at the Chesterfield Career and Technical Center at Route 360 and Chital Drive

Project Map

If map does not load properly on your device, or if you would like to view a full-screen version click here.

 

Why It’s Needed

The Route 288 southbound to Route 360 westbound off-ramp carries a high volume of exiting traffic during the afternoon rush hour, with over 1,700 vehicles in one travel lane. As a result, vehicles back-up onto Route 288 beyond the deceleration lane, extend nearly a mile upstream and causing a pattern of rear-end crashes.

Image

Benefits

These improvements will:
  • Reduce the afternoon back-ups on Route 288
  • Reduce the number of crashes on Route 288
  • Enable vehicles to more safely maneuver from, and traveling through, Route 288
  • Improve travel times
  • Enable ride-sharing opportunities to commuters, thereby reducing the number of vehicles on Route 360 and Route 288

 

Project Resources 

NEPA Environmental Document (PDF – 38 mb)

Traffic Operations Study (PDF – 4 mb)

Interchange Improvements Graphic (PDF – 4 mb)

Park and Ride Lot Improvements Graphic (PDF – 2 mb)

Park and Ride Lot Improvements Conceptual Rendering (PDF – 2 mb)

Design Public Hearing Brochure (PDF – 2 mb)

Preliminary Plans (PDF – 20 mb)

Design Public Hearing Transcript (PDF coming soon)

 